Formula SAE Japan
Q&A > Detail 

Q&A詳細(Detail)
Back to Q&A

No. 0005 Rule No. IC.19

部位・部品
(Part / Component)
Cost and Manufacturing Event


Question
Must cost calculations strictly follow the catalogs and references on fsaeonline.com, or may teams estimate costs using market values?
Is assembly numbering required to follow Appendix C-3, and how specific should codes be (e.g., BR vs. BR-CD)?
If an assembly name does not match the BOM template, may teams modify or remove assembly names?
Will the Fastener Check Audit (FCA) be conducted at FSAEJ?





Official Answer Please wait for the 2nd Edition of Local Rules, as we will clarify the details in it.


Copyright © Formula SAE Japan All Rights Reserved.