
部位・部品 (Part / Component) |
Cost and Manufacturing Event |


|
Question |
|
|
|
Must cost calculations strictly follow the catalogs and references on fsaeonline.com, or may teams estimate costs using market values? Is assembly numbering required to follow Appendix C-3, and how specific should codes be (e.g., BR vs. BR-CD)? If an assembly name does not match the BOM template, may teams modify or remove assembly names? Will the Fastener Check Audit (FCA) be conducted at FSAEJ? |

|
| Official Answer |
Please wait for the 2nd Edition of Local Rules, as we will clarify the details in it.
|
|